Customization: | Available |
---|---|
Driving Type: | AC Elevator |
Capacity: | 400~1600kg |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model: 20K011
Part | Material |
Ceiling | Champain gold st.st., downlight, decorative lights |
Front wall | Champain gold hairline stainless steel |
Back wall | Champain gold st.st., Champain gold mirror etching st.st. |
Side wall | Champain gold st.st., marble grain steel plate |
Handrail | Champain gold st.st. round tube |
Floor | PVC (marble optional) |
Car door | Champain gold hairline stainless steel |
More products please click here
Passenger Elevator With Machine Room
Capacity | Speed | Cabin Size | Shaft Size | Max Travel | ||||||
DL | V | Width | Depth | Open | Width | Depth | Pit | OH | MRH | Max R |
(kg) | (m/s) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (m) |
630 | 1 | 1400 | 1150 | 800*2100 | 2000 | 1800 | 1500 | 4500 | 2300 | 50 |
1.5 | 1600 | 4600 | 70 | |||||||
1.75 | 1700 | 4700 | 90 | |||||||
800 | 1 | 1350 | 1400 | 800*2100 | 2000 | 2100 | 1500 | 4500 | 2300 | 50 |
1.5 | 1600 | 4600 | 70 | |||||||
1.75 | 1700 | 4700 | 90 | |||||||
2 | 2050 | 2100 | 1900 | 5000 | 2500 | 100 | ||||
2.5 | 2100 | 5200 | 120 | |||||||
1000 | 1 | 1600 | 1400 | 900*2100 | 2200 | 2100 | 1500 | 4500 | 2300 | 50 |
1.5 | 1600 | 4600 | 70 | |||||||
1.75 | 1700 | 4700 | 90 | |||||||
2 | 2300 | 2100 | 1900 | 5000 | 2500 | 100 | ||||
2.5 | 2100 | 5200 | 120 | |||||||
1150 | 1 | 1800 | 1400 | 1000*2100 | 2400 | 2100 | 1500 | 4500 | 2300 | 50 |
1.5 | 1600 | 4600 | 70 | |||||||
1.75 | 1700 | 4700 | 90 | |||||||
2 | 2500 | 2150 | 1900 | 5000 | 2500 | 100 | ||||
2.5 | 2200 | 5200 | 120 | |||||||
1350 | 1 | 2000 | 1500 | 1100*2100 | 2600 | 2200 | 1500 | 4500 | 2500 | 50 |
1.5 | 1600 | 4600 | 70 | |||||||
1.75 | 1700 | 4700 | 90 | |||||||
2 | 2700 | 2250 | 1900 | 5000 | 100 | |||||
2.5 | 2200 | 5200 | 120 | |||||||
1600 | 1 | 2000 | 1700 | 1100*2100 | 2600 | 2400 | 1500 | 4600 | 2500 | 50 |
1.5 | 1600 | 4700 | 70 | |||||||
1.75 | 1700 | 4800 | 90 | |||||||
2 | 2700 | 2450 | 1900 | 5100 | 100 | |||||
2.5 | 2200 | 5300 | 120 |
From the raw material getting into factory to finished products getting out to customers, Syney has a strict operation system to control each steps.
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Syney Electric (Hangzhou) Co., Ltd. is a professional enterprise integrating R&D, design, manufacture, marketing, installation and customer service. The company applies whole set of advanced equipments and specializes in design and manufacture of products including passenger lift, sightseeing elevator, bed elevator, cargo elevator, villa elevator, vehical elevator, escalator, passenger travelator, shopping cart trolley escalator, waving escalator, etc. Depending on advanced technologies, modern equipments, standardized management, precise brand location and perfect marketing and service network, Syney business keeps steady growth. Syney network not only covers the whole country, but also expands to over 50 countries in Europe, Asia, Africa and America. Syney is one ofthe most development potential elevator companies in China.
1. How to get fast reply for inquiry?
Send complete information to us, like below example:
Shaft | Not designed | Under construction or Finished |
Elevator type | Tell us the capacity you need or for how many persons, also you can refer to our standard size as below | Passenger, panoramic, cargo, home, car lift |
Machine room | With or without | |
Capacity/persons | 1000kg/13persons | |
Floor/stop/door | 6 floors 6 stops 6 doors | |
Speed | 1.0m/s | |
Cabin door | one cabin door | |
Shaft size | (W)2200*(D)2100 | |
Overhead height | 4500mm (possible to change) | |
Pit depth | 1500mm | |
Each floor height | ≥2700mm | |
Decoration | ||
Cabin | Stainless steel | |
Cabin wall | Stainless steel | |
Main landing door | Stainless steel | |
Other landing door | Painted steel | |
Floor | PVC tile | |
Other requirements | any special requirement, just let us know |
2. How to place order
1) confirm the elevator specification and drawing;
2) sign contract with Syney;
3) production arranged after contract confirmed and payment received;
4) after products finished, inform the customer about the delivery time and book ships;
5) arrange delivery and send documents to customer after shippment;
6) follow up with customer for after sale service.
3. What's your delivery time
Usually 30 days after the arrival of deposit, but urgent production is also avaible. As the biggest and best China elevator and escalator supplier in world, Syney has the ability to support your projects in various ways.
4. What's the product warranty
The warranty for elevators is 18 months after delivery.
5. Installation and commissioning
1) for installation, factory will provide complete set of installation manual.
2) for commissioning, factory can provide remote guiding.
3) for special projects, factory will send engineers to site to help installing.
4) for all our agents, Syney welcome you to send your technicians to our factory to get training. Syney will cover the accomodation and transportation in our city.
6. After sale problems
Please tell us the contract number or product serial number, factory can check the product specifications according to the code.